Project includes:

Civil works:

  • General levelling work
  • Pile foundations of 252 pieces +/-5 m depth
  • Bund (tank pit wall) with concrete floor

 

Construction work:

  • 3 tanks: 2 x 8,500 m³ (diameter 24.5 m and height 18 m) and 1 x 5,000 m³ (diameter 19 m and height 18 m)
  • +/-250 m 6” pipework
  • +/-110 m Jacketed piping 6” in 8”
  • Steel construction such as pipe rack, stairs, cage ladders, etc.
  • Firefighting system
  • Painting work
  • Supply of instruments, pumps, etc.

 