Project includes:
Civil works:
- General levelling work
- Pile foundations of 252 pieces +/-5 m depth
- Bund (tank pit wall) with concrete floor
Construction work:
- 3 tanks: 2 x 8,500 m³ (diameter 24.5 m and height 18 m) and 1 x 5,000 m³ (diameter 19 m and height 18 m)
- +/-250 m 6” pipework
- +/-110 m Jacketed piping 6” in 8”
- Steel construction such as pipe rack, stairs, cage ladders, etc.
- Firefighting system
- Painting work
- Supply of instruments, pumps, etc.
We even made it onto Walloon TV! Be sure to check out the video:
http://www.canalc.be/nouvelle-zone-de-stockage-pour-joassin/