EPC tank park – Ghent
Detailed scope of works: – Construction of 2 storage tanks – Including civil works and piping – Total volume of 6,000 m³
Detailed scope of works: – Installation of gas oil pipes – Pipes with a diameter of 8 inches
Civil: construction of new tank pit (25 m x 10 m) Piping: Construction of piping to loading station Tank construction: 6 double-walled tanks for the storage of fuel Carbon steel (S235) Diameter 4 m; height 6 m Manufacture in workshop Installation on site Transport: exceptional transport with night permits
3D model with 3D plant programme Subject to PED Prefab in workshop + execution on site Product pipes 3″ ±1,600 m CS painted Risers 6″ ±800 m galva + painted Compressed-air pipes 2″ ±400 m + 400 m 1/2″ galva Installation of filters delivery by third parties Installation of 7 pumps Installation of instrumentation
Construction of pipes for the connection of a new tank ± 350 m 6″ & ± 150 m 4″ Engineering & 3D model Built on site Conversion during production