Skip to content
  • Nederlands
  • English
Ivens
Storage of liquids
IvensIvens
  • Home
  • Company
    • Introduction
    • History
    • Projects
    • References
    • Certificates
  • Storage tanks
    • Tank construction
    • Tankrenovation
    • Turnkey projects
    • Prefabrication / Knocked down
    • Projects
  • Piping
    • Piping
    • Projects
  • Pressure vessels
    • Pressure vessels
    • Projects
  • Transport & Cranes
    • Transport
    • Cranes
    • Rollit Cargo
    • Projects
  • Civil
    • Civil
    • Projects
  • News
  • Contact
    • Our contact details
    • Salesteam
  • Vacancies
  • Home
  • Company
    • Introduction
    • History
    • Projects
    • References
    • Certificates
  • Storage tanks
    • Tank construction
    • Tankrenovation
    • Turnkey projects
    • Prefabrication / Knocked down
    • Projects
  • Piping
    • Piping
    • Projects
  • Pressure vessels
    • Pressure vessels
    • Projects
  • Transport & Cranes
    • Transport
    • Cranes
    • Rollit Cargo
    • Projects
  • Civil
    • Civil
    • Projects
  • News
  • Contact
    • Our contact details
    • Salesteam
  • Vacancies

Portfolio Archives: Piping

ZoomDetails

EPC tank park – Ghent

Civil, Piping, Tanks, Turn KeyBy adminNovember 14, 2022

Detailed scope of works: – Construction of 2 storage tanks – Including civil works and piping – Total volume of 6,000 m³

ZoomDetails

Installation of gas oil pipelines – Antwerp

PipingBy adminNovember 14, 2022

Detailed scope of works: – Installation of gas oil pipes – Pipes with a diameter of 8 inches

ZoomDetails

Civil works, tank construction, piping and transport – Torhout

Civil, Piping, Tank constructionBy adminJune 10, 2016

Civil: construction of new tank pit (25 m x 10 m) Piping: Construction of piping to loading station Tank construction: 6 double-walled tanks for the storage of fuel Carbon steel (S235) Diameter 4 m; height 6 m Manufacture in workshop Installation on site Transport: exceptional transport with night permits

ZoomDetails

Modify pipes of existing tank – Geraardsbergen

PipingBy adminJune 8, 2016

3D model with 3D plant programme Subject to PED Prefab in workshop + execution on site Product pipes 3″ ±1,600 m CS painted Risers 6″ ±800 m galva + painted Compressed-air pipes 2″ ±400 m + 400 m 1/2″ galva Installation of filters delivery by third parties Installation of 7 pumps Installation of instrumentation

ZoomDetails

Pipes for connection of new tank – Geel

PipingBy adminJune 8, 2016

Construction of pipes for the connection of a new tank ± 350 m 6″ & ± 150 m 4″ Engineering & 3D model Built on site Conversion during production

ZoomDetails

Jetty

PipingBy adminMarch 24, 2016
Copyright: Ivensgroup
Go to Top