Skip to content
  • Nederlands
  • English
Ivens
Storage of liquids
IvensIvens
  • Home
  • Company
    • Introduction
    • History
    • Projects
    • References
    • Certificates
  • Storage tanks
    • Tank construction
    • Tankrenovation
    • Turnkey projects
    • Prefabrication / Knocked down
    • Projects
  • Piping
    • Piping
    • Projects
  • Pressure vessels
    • Pressure vessels
    • Projects
  • Transport & Cranes
    • Transport
    • Cranes
    • Rollit Cargo
    • Projects
  • Civil
    • Civil
    • Projects
  • News
  • Contact
    • Our contact details
    • Salesteam
  • Vacancies
  • Home
  • Company
    • Introduction
    • History
    • Projects
    • References
    • Certificates
  • Storage tanks
    • Tank construction
    • Tankrenovation
    • Turnkey projects
    • Prefabrication / Knocked down
    • Projects
  • Piping
    • Piping
    • Projects
  • Pressure vessels
    • Pressure vessels
    • Projects
  • Transport & Cranes
    • Transport
    • Cranes
    • Rollit Cargo
    • Projects
  • Civil
    • Civil
    • Projects
  • News
  • Contact
    • Our contact details
    • Salesteam
  • Vacancies

Author Archives: admin

ZoomDetails

Construction of 2 storage tanks – Antwerp

Tank constructionBy adminNovember 14, 2022

Detailed scope of works: – Construction of 2 storage tanks – 1 tank in 316L and 1 tank in carbon steel – Shop fabricated – Total volume of 10,000 m³

ZoomDetails

Replacement of 3 tank foundations – Antwerp

CivilBy adminNovember 14, 2022

Detailed scope of works: – Replacement of 3 tank foundations – Tank diameter of 15.2 m, 14.2 m and 12 m

ZoomDetails

Installation of gas oil pipelines – Antwerp

PipingBy adminNovember 14, 2022

Detailed scope of works: – Installation of gas oil pipes – Pipes with a diameter of 8 inches

ZoomDetails

Knocked down delivery of 1 storage tank – Ghana (AF)

Prefabrication / Knocked downBy adminNovember 14, 2022

Detailed scope of works: – Knocked down delivery of 1 storage tank (prefabrication) – Volume of 330 m³ – Shipped to customer by ship

ZoomDetails

Construction of 3 tank farms – Antwerp

Tank constructionBy adminNovember 14, 2022

Detailed scope of works of the first two tank farms: – Construction of 7 storage tanks – Shop fabricated/Field erected – Total volume of 20,750 m³ Detailed scope of works of the third tank farm: – Construction of 8 storage tanks – Shop fabricated/Field erected – Total volume of 12,500 m³

ZoomDetails

Renovation of 1 storage tank – Ostend

TankrenovationBy adminNovember 14, 2022

Detailed scope of works: – Renovation of the tank bottom – Total volume of 3,000 m³ – 16 m diameter, 14 m high

ZoomDetails

Construction of 2 storage tanks – Verviers

Tank constructionBy adminNovember 14, 2022

Detailed scope of works: – Construction of 2 storage tanks – Stainless steel 316L – Field erected – Equipped with internals – Total volume of 1,500 m³

ZoomDetails

Renovation of 1 storage tank – Togo (AF)

TankrenovationBy adminNovember 14, 2022

Detailed scope of works: – Repairing the tank bottom and first shell – Restore the bottom accessories – Replacement of piping – Total volume of 2,000 m³

ZoomDetails

Construction of an open-top tank – Namur

Tank constructionBy adminNovember 14, 2022

Detailed scope of works: – Construction of an open-top tank – 4,000 m³ – Field erected – Equipped with internal lining

ZoomDetails

Construction of a gazometer – Namur

Tank constructionBy adminNovember 14, 2022

Detailed scope of works: – Construction of a gasometer of 1,800 m³ – Own engineering – Field erected – Storage of PVC gas

←12345…
6789
10→
Copyright: Ivensgroup
Go to Top