- Expansion of TP05 with two duplex tanks of 3,000 m³ fitted with insulation and steam coil
- Expansion of TP06 with two CS tanks of 1,660 m³ fitted with firefighting system
- Complete engineering of piping and E&I with connection to existing truck station and Jetty.