{"id":2103,"date":"2016-05-03T09:23:22","date_gmt":"2016-05-03T09:23:22","guid":{"rendered":"https:\/\/ivensgroup.com\/project\/newbuild-project-tank-farm-tanks-and-piping-namur\/"},"modified":"2016-05-03T09:23:22","modified_gmt":"2016-05-03T09:23:22","slug":"newbuild-project-tank-farm-tanks-and-piping-namur","status":"publish","type":"dt_portfolio","link":"https:\/\/ivensgroup.com\/en\/project\/newbuild-project-tank-farm-tanks-and-piping-namur\/","title":{"rendered":"Newbuild project: tank farm, tanks and piping \u2013 Namur"},"content":{"rendered":"<p>Project includes:<\/p>\n<p>Civil works:<\/p>\n<ul>\n<li>General levelling work<\/li>\n<li>Pile foundations of 252 pieces +\/-5 m depth<\/li>\n<li>Bund (tank pit wall) with concrete floor<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>Construction work:<\/p>\n<ul>\n<li>3 tanks: 2 x 8,500 m\u00b3 (diameter 24.5 m and height 18 m) and 1 x 5,000 m\u00b3 (diameter 19 m and height 18 m)<\/li>\n<li>+\/-250 m 6\u201d pipework<\/li>\n<li>+\/-110 m Jacketed piping 6\u201d in 8\u201d<\/li>\n<li>Steel construction such as pipe rack, stairs, cage ladders, etc.<\/li>\n<li>Firefighting system<\/li>\n<li>Painting work<\/li>\n<li>Supply of instruments, pumps, etc.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>We even made it onto Walloon TV! Be sure to check out the video:<\/p>\n<p><a href=\"http:\/\/www.canalc.be\/nouvelle-zone-de-stockage-pour-joassin\/\">http:\/\/www.canalc.be\/nouvelle-zone-de-stockage-pour-joassin\/<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project includes: Civil works: General levelling work Pile foundations of 252 pieces +\/-5 m depth Bund (tank pit wall) with concrete floor &nbsp; Construction work: 3 tanks: 2 x 8,500 m\u00b3 (diameter 24.5 m and height 18 m) and 1 x 5,000 m\u00b3 (diameter 19 m and height 18 m) +\/-250 m 6\u201d pipework +\/-110&hellip;<\/p>\n","protected":false},"author":1,"featured_media":1740,"comment_status":"closed","ping_status":"closed","template":"","dt_portfolio_category":[33],"dt_portfolio_tags":[],"class_list":["post-2103","dt_portfolio","type-dt_portfolio","status-publish","has-post-thumbnail","hentry","dt_portfolio_category-tank-construction","dt_portfolio_category-33","description-off"],"_links":{"self":[{"href":"https:\/\/ivensgroup.com\/en\/wp-json\/wp\/v2\/dt_portfolio\/2103","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ivensgroup.com\/en\/wp-json\/wp\/v2\/dt_portfolio"}],"about":[{"href":"https:\/\/ivensgroup.com\/en\/wp-json\/wp\/v2\/types\/dt_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/ivensgroup.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ivensgroup.com\/en\/wp-json\/wp\/v2\/comments?post=2103"}],"version-history":[{"count":0,"href":"https:\/\/ivensgroup.com\/en\/wp-json\/wp\/v2\/dt_portfolio\/2103\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ivensgroup.com\/en\/wp-json\/wp\/v2\/media\/1740"}],"wp:attachment":[{"href":"https:\/\/ivensgroup.com\/en\/wp-json\/wp\/v2\/media?parent=2103"}],"wp:term":[{"taxonomy":"dt_portfolio_category","embeddable":true,"href":"https:\/\/ivensgroup.com\/en\/wp-json\/wp\/v2\/dt_portfolio_category?post=2103"},{"taxonomy":"dt_portfolio_tags","embeddable":true,"href":"https:\/\/ivensgroup.com\/en\/wp-json\/wp\/v2\/dt_portfolio_tags?post=2103"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}